F1 · Venue size (Casablanca)
~3,000 m²Equipment Cost Defense
3,850 m² + 1,350 m² rooftop9-Pager · Business Plan
4,500–4,800 m²Lessor Brief
✓6,300 m² — Pixoul described as a component within itMYCC Submission · Corporate Structure · current Plan
F2 · Abu Dhabi track record
147,000+ students trained9-Pager · Lessor Brief · LOI drafts
✓10,000+ students · 150,000+ visitors · 100+ schoolsLegal docs · MJCC letter — survives diligence
F3 · Abu Dhabi financials HIGHEST LIABILITY
"$7M+ annual revenue · audited" (present tense)All raise documents
~$800K profits FY2025 · since collapsedRobocom v2 · Al Qana letter
✓"Peak revenue $7M (FY20XX, audited); operations disrupted by the 2025–26 conflict"Needs: audited figure + year from Toufic
F4 · Abu Dhabi valuation RECONCILABLE
Grant Thornton AED 38–48M9-Pager
"Targeting USD 10–15M, frozen"Robocom v2
✓Same number! AED 38–48M ≈ USD 10.3–13.1M. Say: "GT valuation engaged on a USD 10–15M range; paused by the conflict"True in both documents
F5 · CapEx (Casablanca)
$12M headline vs $10.6M itemized — same page9-Pager
✓"$10.84M itemized; $12M total program incl. contingency" — MYCC's $6.5M always labeled Round-1 scopeEquipment Cost Defense (bottom-up)
F6 · Investor terms STRUCTURAL — NEEDS COUNSEL
$4M for 25% @ $12M pre · drag 66%9-Pager
$7.82M for 45% @ $17.38M postStale plan PDF
✓One offer: $9.08M / 49% / $18.55M post (matches legal structure) — with the management & IP fee stack disclosed in the investor docsCurrent Plan + Corporate Structure · drag 75%
F7 · Canonical financial model
v74 (plan-cited) · v73 (newer date) · v70.5 (internals)Filename chaos
✓Jul 4 file becomes canonical, renamed with date; git carries versions from now onThen reconcile its 1.70× / 16.35% vs plan claims
F8 · Summit budget & date
Costs $3.64M · surplus +$2.08M · 10% contingencyMaster plan HTML
✓Deck version externally: costs $4.43M · surplus +$1.32M · 15% contingency · date December 2026 firm6-page deck + MJCC letters
F9 · Catalog / ATR claims
47 chapters · 12+1 volumes (planned, never built)Python build source
✓55 chapters · 9 acts · 19 volumes · 1,081+ products · 111 brands — everywhereATR · MoC prep · MJCC letter
F10 · Opening timeline
Q2 2027 (current HTML) · Q3 2027/Q1 2028 (PDF)Calendar-anchored, no signed lease
✓Lease-anchored: soft opening at month 13, full at month 15 from lease signature (indicative Q3 2027)Equipment Cost Defense logic
Status
Decisions recorded Jul 4. Workspace HTML deliverables swept same day; the binary documents (9-Pager, LOIs, briefs) have a regeneration checklist in ALIGNMENT_SWEEP.md. F6 reopens when counsel rules.